VIA Rail Canada
The Pas → Churchill
Alert from VIA Rail
Since Apr 24, 6:37 p.m.
Train 691 - Train partially cancelled
This train has been cancelled from Thompson to Churchill with no alternate transportation due to to our host railway experiencing infrastructure constraints blocking rail traffic along the route.
On-Time Performance
Train 691 · 28 days of data
Late
Avg. Arrival
Observed
Station-by-Station Performance
Average delay at each stop along the route
The Pas
+20m
Orok
+24m
Halcrow
+18m
Cormorant
+18m
Dering
+18m
Dyce
+15m
Wekusko
+18m
Turnbull
+17m
Ponton
+13m
Pipun
+16m
Wabowden
+8m
Lyddal
+9m
Odhill
+11m
Hockin
+7m
Thicket Portage
+5m
Leven
+14m
Thompson
+14m
Sipiwesk
+9m
Pikwitonei
+14m
Bridgar
+14m
Pit Siding
+20m
Ilford
+52m
Wivenhoe
+1h 10m
Gillam
+1h 8m
Bird
+53m
Amery
+1h 3m
Weir River
+1h 9m
Thibaudeau
+1h 9m
Herchmer
+37m
O'Day
+52m
M'Clintock
+54m
Chesnaye
+53m
Tidal
+21m
Churchill
+54m
Recent Trips
All times shown in your local time (ET)
| Departure Date | Sched. Departure | Actual Departure | Sched. Arrival | Actual Arrival | Delay |
|---|---|---|---|---|---|
Fri, Apr 241 | — | — | — | Cancelled | Cancelled |
Fri, Apr 17 | 3:30 amET | 3:32 amET | 10:00 amET+1d | 11:35 amET+1d | 1h 35m late |
Fri, Apr 101 | 3:30 amET | 3:30 amET | 10:00 amET+1d | 9:50 amET+1d | 9m early |
Fri, Apr 3 | 3:30 amET | 4:28 amET | 10:00 amET+1d | 11:15 amET+1d | 1h 16m late |