All trains
79

VIA Rail Canada

Toronto → Windsor

On-Time Performance

Train 79 · 27 days of data

Late

93%

Avg. Arrival

+39m

Observed

27
Early
0%
On time
7%
5–14m late
4%
15–29m late
26%
30–59m late
48%
1h+ late
15%
Cancelled
0%

Station-by-Station Performance

Average delay at each stop along the route

Windsor

+38m

4% on timeworst: +1h 44m26 trips

Toronto

on time

100% on timeworst: on time2 trips

Oakville

+4m

100% on timeworst: +4m2 trips

Aldershot

+6m

100% on timeworst: +6m2 trips

Brantford

+12m

50% on timeworst: +17m2 trips

Woodstock

+12m

50% on timeworst: +18m2 trips

Ingersoll

+25m

33% on timeworst: +56m3 trips

London

+7m

50% on timeworst: +12m2 trips

Glencoe

+6m

50% on timeworst: +12m2 trips

Chatham

+26m

33% on timeworst: +52m3 trips

Recent Trips

All times shown in your local time (ET)